Steam & Utility Efficiency Project

Integrated Steam & Utility Efficiency Case Study

Garment Manufacturing Facility, Bangladesh

The Challenge

A large-scale CMT garment manufacturing plant with 100 steam irons and a 1.5 TPH boiler suffered from utility inefficiencies. Venting flash steam, leaking distribution valves, uninsulated pipelines, and inefficient clutch motors led to high natural gas and electricity waste.

The Solution

A comprehensive energy audit was conducted and 12 clean energy measures were implemented: Flash Steam Recovery, Condensate Recovery, Steam Line Leak Repair, Piping Insulation, TDS Blowdown control, Steam Saving Irons, Generator Exhaust Gas Boiler (EGB), Flue Gas Condensing Economizer, Servo sewing motors, Direct-Drive Fans, LED Lighting, and Compressed Air leak repair.

Process Optimization Flow

Process animation
1
Ironing Condensate

High Pressure iron discharge collected

2
Flash Separation

Vessel separates steam and condensate

3
Boiler Feed preheat

Exchanger preheats boiler feedwater up to 90°C

4
Low fuel load

Boiler fuel consumption reduced by 6%

Key Highlights

Exhaust Gas Boiler (EGB):

Captures generator waste heat to produce process steam, saving $86,519/year with a 17-month payback.

Condensing Economizer:

Recovers heat from 140°C boiler exhaust to preheat feedwater, saving $41,726/year.

Steam Saving Irons:

Replaced 100 conventional irons, cutting steam use per iron by 50% and saving $25,177/year in fuel costs.

12 Interventions:

Comprehensive project balancing high-investment recovery vessels with low-cost distribution leak repairs.

Energy Conservation Measures

# Measure Investment Annual Savings Payback Impact Scope
1Flash Steam Recovery System$5,000$3,11519 months12,596 m³ Gas (6%)
2Condensate Recovery System$5,000$2,71322 months1,200 m³ Water (48%)
3Distribution Leak Repairs$200$2,7781 month11,220 m³ Gas (6%)
4Steam Piping Insulation$775$95810 months3,881 m³ Gas (1%)
5Boiler Automatic TDS Blowdown$1,646$79625 months3,215 m³ Gas (1%)
6Steam-Saving Sewing Irons$8,228$25,1774 months102,000 m³ Gas (50%)
7Generator Exhaust Gas Boiler$120,000$86,51917 months297,939 m³ Gas (9%)
8Boiler Flue Gas Economizer$70,000$41,72620 months169,046 m³ Gas (11%)
9Sewing Machine Servo Motors$12,342$4,93730 months48,000 kWh (50%)
10Direct-Drive Exhaust Fans$19,220$7,90029 months76,800 kWh (36%)
11LED Lighting Retrofit$3,168$1,62023 months15,750 kWh (36%)
12Compressed Air Leak Repair$2,500$4,4657 monthsSystem leaks closed

Resource Impact Metrics

0
Annual Natural Gas Saved (m³)
0
Annual Electricity Saved (kWh)
0
CO₂ Emissions Offset (Tons)

Financial Performance

Total Investment
$248,079
Annual Savings
$184,904 / yr
Payback Period
1.34 Years

Live ROI Simulator

Adjust parameters to estimate savings for your facility

Est. Gas Saved
615,000 m³
Est. Electricity Saved
140,550 kWh
Est. Financial Savings
$232,116 / yr
Payback: 1.07 Years

Creating a Sustainable Future...